Milwaukee, WI
+1.815.791.1727
Konecranes logo
Maverick Sourcing & Procurement

Konecranes

Manufacturing / Industrial

Challenge

A heavy dependence on European manufacturing created high landed costs and three-month lead times, constraining production flexibility, slowing response to customer demand, and weakening North American market competitiveness.

Maverick Approach

  • Qualified Mexican fabricators meeting EU welding requirements
  • Bridged Swedish engineering standards with North American supplier capabilities
  • Completed SSAB S690 steel material equivalent qualification

Results

Key savings

$3M+ annual savings (15% landed cost reduction)

  • $3M+ annual savings (15% landed cost reduction)
  • 3-month lead-time reduction
  • Major assemblies transitioned from Europe to Mexico

Maverick Impact

Bridged supply chains, engineering requirements, and cultural differences across regions to unlock sustainable global competitiveness and improved execution.